Engineering Study. Integral refunctionalization Cristo Redentor Path

A diagnosis of the current situation, basic engineering studies and feasible alternatives, so as to establish a system integrating the modified and adapted to the new requirements idle infrastructure in order to achieve better connectivity main priority border crossing between Chile and Argentina. Thus, the main objective of this project will analyze the feasibility of the following interventions: (i) Expansion of the section of Caracoles tunnel and the construction of interconnection galleries ; (ii) Comprehensive Improvement Cristo Redentor tunnel; and (iii) Unification of the system operation.

Project Detail

Country

Regional

Project Number

RG-T2878

Approval Date

October 20, 2016

Project Status

Closed

Project Type

Technical Cooperation

Sector

TRANSPORT

Subsector

BORDER CROSSINGS AND INFRASTRUCTURE, EQUIPMENT FOR BORDER CROSSINGS.

Lending Instrument

-

Lending Instrument Code

-

Modality

-

Facility Type

-

Environmental Classification

Likely to cause minimal or no negative environmental and associated social impacts

Total Cost

USD 720,000.00

Country Counterpart Financing

USD 120,000.00

Original Amount Approved

USD 600,000.00

Financial Information
Operation Number Lending Type Reporting Currency Reporting Date Signed Date Fund Financial Instrument
ATN/OC-15803-RG Sovereign Guaranteed USD - United States Dollar Ordinary Capital Nonreimbursable
Operation Number ATN/OC-15803-RG
  • Lending Type: Sovereign Guaranteed
  • Reporting Currency: USD - United States Dollar
  • Reporting Date:
  • Signed Date:
  • Fund: Ordinary Capital
  • Financial Instrument: Nonreimbursable

Can’t find a document? Request information

Implementation Phase
https://www.iadb.org/document.cfm?id=EZSHARE-688126111-11
Approved TC document
Argentina y Chile_Estudio_de_Ingienería_Refuncionalización_Integral_del_Paso_Sistena_Cristo_Redentor [40734677].PDF
Dec. 02, 2016
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-688126111-166
Procurement Plan
Estudio de Ingenieria Refuncionalizacion Integral del Paso Cristo Redentor_ Plan de Adquisiciones_ Oct16 Ene18 [40824004].docx
Jan. 27, 2017
Spanish

Have an Environmental or Social issue related to IDB projects? File a Complaint

Jump back to top