Skip to main content

Strengthening the Multi-Hazard National Early Warning System

The specific objectives of the project are: (i) strengthening the capacity to monitor threats and risk analysis associated with SAT; and (ii) improvement in the communication of the alert to the communities and strengthening of their response capacity. The achievement of these objectives will contribute to the general objective of reducing the number of people potentially affected by floods (including river overflows), landslides, tsunamis and volcanic eruptions in Ecuador, through the universal provision of accurate early warning information and the implementation of activities to strengthen community resilience capacity.

Project Detail

Country

Ecuador

Project Number

EC-L1285

Approval Date

September 20, 2023

Project Status

Implementation

Project Type

Loan Operation

Sector

ENVIRONMENT AND NATURAL DISASTERS

Subsector

INTEGRATED DISASTER RISK MANAGEMENT

Lending Instrument

Préstamo de Inversión

Lending Instrument Code

INV

Modality

ESP (Specific Investment Operation)

Facility Type

-

Environmental Classification

Likely to cause minimal or no negative environmental and associated social impacts

Total Cost

USD 11,937,472.00

Country Counterpart Financing

USD 1,937,472.00

Original Amount Approved

USD 10,000,000.00

Financial Information
Operation Number Lending Type Reporting Currency Reporting Date Signed Date Fund Financial Instrument
5787/OC-EC Sovereign Guaranteed USD - United States Dollar Ordinary Capital Flexible Financing Facility
Operation Number 5787/OC-EC
  • Lending Type: Sovereign Guaranteed
  • Reporting Currency: USD - United States Dollar
  • Reporting Date:
  • Signed Date:
  • Fund: Ordinary Capital
  • Financial Instrument: Flexible Financing Facility

Can’t find a document? Request information

Implementation Phase
https://www.iadb.org/document.cfm?id=EZIDB0000366-2056220512-9657
Loan Contract
Contrato - Fortalecimiento del Sistema Nacional de Alerta Temprana Ante Múltiples Amenazas.pdf
Jun. 27, 2024
Spanish
https://www.iadb.org/document.cfm?id=EZIDB0000578-522669563-45257
Project Monitoring Report ( Public version)
EC-L1285 Second period Jan-Dec 2023 - Public Report.PDF
Jul. 02, 2024
English
https://www.iadb.org/document.cfm?id=EZIDB0000366-965128629-49918
Loan Contract
Strengthening the Multi-Hazard National Early Warning System.pdf
Sep. 27, 2023
English
https://www.iadb.org/document.cfm?id=EZIDB0000366-965128629-49919
Loan Contract
Fortalecimiento del Sistema Nacional de Alerta Temprana Ante Múltiples Amenazas.pdf
Sep. 27, 2023
Spanish
https://www.iadb.org/document.cfm?id=EZIDB0000233-716636498-96
Loan Proposal
Ecuador. Propuesta de Prestamo para el proyecto Fortalecimiento del Sistema Nacional de Alerta Temprana ante Multiples Amenazas (EC-L1285).pdf
Sep. 07, 2023
Spanish
https://www.iadb.org/document.cfm?id=EZIDB0000233-716636498-95
Loan Proposal
Ecuador. Loan Proposal for the project Strengthening the Multi-Hazard National Early Warning System (EC-L1285).pdf
Sep. 07, 2023
English
Other Documents
https://www.iadb.org/document.cfm?id=EZIDB0000233-716636498-52
Electronic Links
EE#4 - Analisis Economico Ex ante - EC-L1285.pdf
Sep. 07, 2023
Spanish
https://www.iadb.org/document.cfm?id=EZIDB0000233-716636498-49
Electronic Links
EE#3 - Plan de Monitoreo y Evaluacioi`n (ME) - EC-L1285.pdf
Sep. 07, 2023
Spanish
https://www.iadb.org/document.cfm?id=EZIDB0000233-716636498-47
Electronic Links
EE#6 - Reglamento Operativo del Proyecto - ROP - EC-L1285.pdf
Sep. 07, 2023
Spanish
https://www.iadb.org/document.cfm?id=EZIDB0000233-716636498-46
Electronic Links
EE#5 - Plan de Adquisiciones - EC-L1285.pdf
Sep. 07, 2023
Spanish
https://www.iadb.org/document.cfm?id=EZIDB0000233-716636498-43
Electronic Links
EE#2 - Resumen de la Evaluación Ambiental y social - EC-L1285.docx
Sep. 07, 2023
Spanish
https://www.iadb.org/document.cfm?id=EZIDB0000233-716636498-42
Electronic Links
EE#1 - Plan de Ejecución del Proyecto EC-L1285.xlsm
Sep. 07, 2023
Spanish
Preparation Phase
https://www.iadb.org/document.cfm?id=EZIDB0000233-716636498-36
Project Profile
EC-L1285-Perfil de Proyecto.pdf
May. 02, 2023
Spanish

Have an Environmental or Social issue related to IDB projects? File a Complaint

Jump back to top