PHASE TWO OF THE PROGRAM TO BUILD CAPACITY AND IMPROVE SAFETY ON THE ACCESSES TO THE CRISTO REDENTOR BORDER CROSSING

The overall objective of the Conditional Credit Line for Investment Projects (CCLIP) is to help enhance cross-border integration between Chile and Argentina by reducing travel times and transportation costs on the Cristo Redentor System Corridor (CRSC) through the provision of transportation infrastructure and a border integration system to facilitate regional connectivity.The specific objective of the second operation is to improve service quality on the CRSC by reducing travel times and transportation costs. This will be achieved by expanding the Caracoles Tunnel, retrofitting the Cristo Redentor Tunnel, constructing bypass roads in urban areas, implementing rehabilitation of works, expanding capacity, improving road safety, and implementing a corridor management system.

Project Detail

Country

Argentina

Project Number

AR-L1295

Approval Date

November 2, 2018

Project Status

Implementation

Project Type

Loan Operation

Sector

TRANSPORT

Subsector

TRANSPORT

Lending Instrument

Préstamo de Inversión

Lending Instrument Code

INV

Modality

GOM (Global of Multiple Works Operation)

Facility Type

-

Environmental Classification

Likely to cause mostly local and short-term negative environmental and associated social impacts and for which effective mitigation measures are readily available

Total Cost

USD 531,900,000.00

Country Counterpart Financing

USD 207,600,000.00

Original Amount Approved

USD 324,300,000.00

Financial Information
Operation Number Lending Type Reporting Currency Reporting Date Signed Date Fund Financial Instrument
4652/OC-AR Sovereign Guaranteed USD - United States Dollar Ordinary Capital Flexible Financing Facility
Operation Number 4652/OC-AR
  • Lending Type: Sovereign Guaranteed
  • Reporting Currency: USD - United States Dollar
  • Reporting Date:
  • Signed Date:
  • Fund: Ordinary Capital
  • Financial Instrument: Flexible Financing Facility

Can’t find a document? Request information

Implementation Phase
https://www.iadb.org/document.cfm?id=EZIDB0000578-522669563-44687
Project Monitoring Report ( Public version)
AR-L1295 Second period Jan-Dec 2023 - Public Report.PDF
Jun. 28, 2024
English
https://www.iadb.org/document.cfm?id=EZIDB0000029-421405757-53
Annual Project Audited Financial Statement
Estados financieros auditados - ejercicio 2023.pdf
Jun. 11, 2024
Spanish
https://www.iadb.org/document.cfm?id=EZIDB0000578-522669563-44019
Project Monitoring Report ( Public version)
AR-L1295 First period Jan-Jun 2023 - Public Report.PDF
Jan. 25, 2024
English
https://www.iadb.org/document.cfm?id=EZIDB0000578-522669563-43369
Project Monitoring Report ( Public version)
AR-L1295 Second period Jan-Dec 2022 - Public Report.PDF
Jul. 19, 2023
English
https://www.iadb.org/document.cfm?id=EZIDB0000029-421405757-40
Annual Project Audited Financial Statement
Estados Financieros Auditados - Ejercicio 2022.pdf
May. 31, 2023
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-34783
Specific Procurement Notices
AR-L1295_P1131234_SP.pdf
Feb. 02, 2023
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-42115
Project Monitoring Report ( Public version)
AR-L1295 First period Jan-Jun 2022 - Public Report.PDF
Feb. 08, 2023
English
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-40866
Project Monitoring Report ( Public version)
AR-L1295 Second period Jan-Dec 2021 - Public Report.PDF
Aug. 11, 2022
English
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-35230
Project Monitoring Report ( Public version)
AR-L1295 First period Jan-Jun 2021 - Public Report.pdf
Feb. 16, 2022
English
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-34628
Project Monitoring Report ( Public version)
AR-L1295 Second period Jan-Dec 2020 - Public Report.pdf
Jul. 20, 2021
English
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-30729
Notice of Contract Award (SG)
AR-L1295_C699361_AW.pdf
Mar. 23, 2021
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-33962
Project Monitoring Report ( Public version)
AR-L1295 First period Jan-Jun 2020 - Public Report.pdf
Mar. 08, 2021
English
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-33314
Project Monitoring Report ( Public version)
AR-L1295 Second period Jan-Dec 2019-Public Report.pdf
Aug. 24, 2020
English
https://www.iadb.org/document.cfm?id=EZSHARE-30346992-11
Loan Proposal
EEO_3_Estudios Tecnicos de las Obras.pdf
Oct. 19, 2018
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-30346992-5
Loan Proposal
EEO_6_Anexo de Integración_AR-L1295_Final_Limpio.docx
Oct. 19, 2018
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-30346992-14
Loan Proposal
EEO_11_Anexo de Seguridad Vial.pdf
Oct. 22, 2018
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-30346992-7
Loan Proposal
EEO_9_Tomo_I_Estudio_de_optimizacion_del_paso_de_frontera[1].pdf
Oct. 22, 2018
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-30346992-19
Loan Proposal
EEO_1_Evaluacion Economica_AR-L1295.pdf
Oct. 19, 2018
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-30346992-8
Loan Proposal
EEO_8_Estudio Binacional de Conectividad Argentina-Chile.pdf
Oct. 22, 2018
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-30346992-2
Loan Proposal
EER_5_Plan de adquisiciones.xlsx
Oct. 19, 2018
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-31997
Project Monitoring Report ( Public version)
AR-L1295 Second period Jan-Dec 2018-Public Report.pdf
Oct. 15, 2019
English
https://www.iadb.org/document.cfm?id=EZSHARE-30346992-20
Loan Proposal
EEO_15_Sistema de Control de Gestion.docx
Oct. 22, 2018
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-32680
Project Monitoring Report ( Public version)
AR-L1295 First period Jan-Jun 2019-Public Report.pdf
Feb. 12, 2020
English
https://www.iadb.org/document.cfm?id=EZSHARE-30346992-21
Loan Proposal
EER_4_IGAS_AR-L1295.docx
Oct. 19, 2018
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-30346992-22
Loan Proposal
EEO_2_El_Sector_Vial_Argentino_y_Necesidades_de_FI_V01.pdf
Oct. 19, 2018
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1470197173-48209
Loan Contract
Segunda Etapa de Ampliación de Capacidad y Mejoras de Seguridad en los Accesos al Paso Cristo Redentor.pdf
Nov. 27, 2018
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-30346992-3
Loan Proposal
EER_2_PEP y POA.xlsx
Oct. 19, 2018
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1470197173-48210
Loan Contract
Phase Two of the Program to Build Capacity and Improve Safety on the Accesses to the Cristo Redentor Border Crossing.pdf
Nov. 27, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-2056220512-6514
Loan Contract
Contrato - Segunda Etapa de Ampliación de Capacidad y Mejoras de Seguridad en los Accesos al Paso Cristo Redentor - Segunda Operación CCLIP.pdf
Aug. 19, 2019
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-30346992-41
Loan Proposal
Argentina. Propuesta de préstamo individual para la Segunda Etapa de Ampliación de Capacidad y Mejoras de Seguridad en los Accesos al Paso Cristo Redentor”.pdf
Oct. 19, 2018
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-30346992-10
Loan Proposal
EER_3_Plan de Monitoreo y Evaluación.docx
Oct. 19, 2018
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-30346992-42
Loan Proposal
Argentina. Proposal for an individual loan for the Phase Two of the Program to Build Capacity and Improve Safety on the Accesses to the Cristo Redentor Border Crossing”.pdf
Oct. 19, 2018
English
Preparation Phase
https://www.iadb.org/document.cfm?id=EZSHARE-781727023-13
Public Consultation Report
Socializacion Chile final.pdf
Aug. 23, 2018
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-781727023-14
Environmental and Social Analyses
EIA complementario.pdf
Aug. 23, 2018
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-781727023-15
Strategic Environmental Assessments
EASE.pdf
Aug. 23, 2018
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-781727023-5
Environmental Impact Assessments
ESTUDIO DE IMPACTO AMBIENTAL.pdf
May. 24, 2018
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-781727023-6
Environmental and Social Analyses
Analisis_Impactos_Complementarios_Túnel_Caracoles.pdf
May. 24, 2018
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-781727023-7
Public Consultation Report
Plan de Consulta Publica.pdf
May. 24, 2018
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-781727023-12
Environmental Impact Assessments
EIA.pdf
Aug. 23, 2018
Spanish
Other Documents
https://www.iadb.org/document.cfm?id=EZSHARE-30346992-4
Results Matrix
EER_1_Matriz DEM.xlsx
May. 08, 2019
English