Skip to main content

Investigation of the Effects of Intermittent Water Supply on Drinking Water Qual

To evaluate the effects of different drinking water supply situations (ranging from continuous to different varieties of intermittent supply) on drinking water quality, infrastructure integrity, and leakage.

Project Detail

Country

Regional

Project Number

RG-T2441

Approval Date

April 1, 2014

Project Status

Closed

Project Type

Technical Cooperation

Sector

WATER AND SANITATION

Subsector

WATER SUPPLY URBAN

Lending Instrument

-

Lending Instrument Code

-

Modality

-

Facility Type

-

Environmental and Social Impact Category (ESIC)

Category C: Likely to cause minimal or no negative environmental and associated social impacts

Total Cost

USD 105,000.00

Country Counterpart Financing

USD 0.00

Original Amount Approved

USD 105,000.00

Financial Information
Operation Number Lending Type Reporting Currency Reporting Date Signed Date Fund Financial Instrument
ATN/OC-14360-RG Sovereign Guaranteed USD - United States Dollar Ordinary Capital Nonreimbursable
Operation Number ATN/OC-14360-RG
  • Lending Type: Sovereign Guaranteed
  • Reporting Currency: USD - United States Dollar
  • Reporting Date:
  • Signed Date:
  • Fund: Ordinary Capital
  • Financial Instrument: Nonreimbursable

Can’t find a document? Request information

Other Documents
https://www.iadb.org/document.cfm?id=EZSHARE-1299848666-5004
Technical Note
Intermittent Supply in the Context of Efforts to Improve Piped Drinking Water Supply in Latin America and the Ca [40789068].PDF
Dec. 19, 2016
English
https://www.iadb.org/document.cfm?id=EZSHARE-1299848666-5003
Technical Note
Intermittent Supply in the Context of Efforts to Improve Piped Drinking Water Supply in Latin America and the Ca [40789067].PDF
Dec. 19, 2016
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1299848666-21
Procurement
RG-T2441 [40734169].PDF
Nov. 04, 2016
English
https://www.iadb.org/document.cfm?id=EZSHARE-251515826-2
TC Abstract
TC Abstract- Investigation of the effects of the intermittent water supply on drinking water quality and infrast [38595287].PDF
Jul. 09, 2014
English
Implementation Phase
https://www.iadb.org/document.cfm?id=EZSHARE-1299848666-19
Approved TC document
Informe Final - Berkeley English version [40193397].PDF
Nov. 22, 2016
English
https://www.iadb.org/document.cfm?id=EZSHARE-1299848666-20
Approved TC document
Informe Final Berkeley versión Español [40193422].PDF
Nov. 22, 2016
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1299848666-16
Procurement Plan
Procurement Plan (PP) [38648377].xlsx
Aug. 13, 2015
English
https://www.iadb.org/document.cfm?id=EZSHARE-1299848666-17
Approved TC document
Carta de Gobierno- Nota DS CTI 089 BID IDAAN Efectos Servicio Intermitente RG T2441 [38659821].PDF
Aug. 13, 2015
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1299848666-15
Approved TC document
Detailed Budget [38647784].xlsx
Aug. 13, 2015
English
https://www.iadb.org/document.cfm?id=EZSHARE-1299848666-14
Approved TC document
Terms of Reference-Investigation of the Effects of Drinking Water Quality and Infrastructure [38647662].docx
Aug. 13, 2015
English
https://www.iadb.org/document.cfm?id=EZSHARE-1299848666-11
Approved TC document
The Safeguard Policy Filter Report (SPF) _ The Safeguard Screening Form Report (SSF) [38591953].HTM
Aug. 13, 2015
English
https://www.iadb.org/document.cfm?id=EZSHARE-1299848666-22
Approved TC document
The Safeguard Policy Filter Report (SPF) _ The Safeguard Screening Form Report (SSF) [38591953].pdf
Aug. 13, 2015
English
https://www.iadb.org/document.cfm?id=EZSHARE-1299848666-12
Approved TC document
Nota IDAAN Estudio Intermitencia [38591987].PDF
Aug. 13, 2015
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1299848666-13
Approved TC document
RG_T2441Justification_Single Sourcing [38592141].DOCX
Aug. 13, 2015
English
https://www.iadb.org/document.cfm?id=EZSHARE-1299848666-18
Approved TC document
Investigation of the Effects of Intermittent Water Supply on Drinking Water Quality and Infrastructure [38713847].PDF
Jul. 09, 2014
English

Have an Environmental or Social issue related to IDB projects? File a Complaint

Jump back to top