Skip to main content

Strengthen Social Intersectoral Coordination Program

The objective of the program is to strengthen the intersector coordination of the social sectors, by physically grouping together all the social sector ministries as well as developing and implementing an intersector coordination model that integrates processes and systems, permiting a better articulation at the national and local level.

Project Detail

Country

Ecuador

Project Number

EC-L1129

Approval Date

November 19, 2014

Project Status

Closed

Project Type

Loan Operation

Sector

SOCIAL INVESTMENT

Subsector

POVERTY ALLEVIATION

Lending Instrument

Préstamo de Inversión

Lending Instrument Code

INV

Modality

ESP (Specific Investment Operation)

Facility Type

-

Environmental and Social Impact Category (ESIC)

Category B: Likely to cause mostly local and short-term negative environmental and associated social impacts and for which effective mitigation measures are readily available

Total Cost

USD 81,100,000.00

Country Counterpart Financing

USD 1,100,000.00

Original Amount Approved

USD 80,000,000.00

Financial Information
Operation Number Lending Type Reporting Currency Reporting Date Signed Date Fund Financial Instrument
3341/OC-EC Sovereign Guaranteed USD - United States Dollar Ordinary Capital Flexible Financing Facility
Operation Number 3341/OC-EC
  • Lending Type: Sovereign Guaranteed
  • Reporting Currency: USD - United States Dollar
  • Reporting Date:
  • Signed Date:
  • Fund: Ordinary Capital
  • Financial Instrument: Flexible Financing Facility

Can’t find a document? Request information

Closed Phase
https://www.iadb.org/document.cfm?id=EZSHARE-820377557-9
Project Completion Report
PCR EC-L1129 - Final.pdf
Jan. 04, 2023
Spanish
Other Documents
https://www.iadb.org/document.cfm?id=EZSHARE-820377557-7
Electronic Links
Enlace Resumen DEM PCR-EC_L1129.pdf
Jan. 04, 2023
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-446559947-451
Electronic Links
PCR - PMR report (EC-L1129).pdf
Jan. 04, 2023
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-446559947-450
Electronic Links
PCR Checklist Investment Expanded (EC-L1129).xlsx
Jan. 04, 2023
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-446559947-446
Electronic Links
PCR Anexo 7 Resultados No anticipados.pdf
Jan. 04, 2023
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-446559947-447
Electronic Links
PCR Anexo 8 Informe para Indicadores Contratista 2018.pdf
Jan. 04, 2023
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-446559947-448
Electronic Links
PCR Anexo 9 Informe de cumplimiento del Plan de Manejo Ambiental.pdf
Jan. 04, 2023
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-446559947-449
Electronic Links
PCR Anexo 10 Archivo fotografico PGDS.pdf
Jan. 04, 2023
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-446559947-441
Electronic Links
PCR Anexo 2 Relevancia del Diseno.pdf
Jan. 04, 2023
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-446559947-442
Electronic Links
PCR Anexo 3 Evaluacion Ex post.pdf
Jan. 04, 2023
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-446559947-443
Electronic Links
PCR Anexo 4 Informe de Indicadores SENPLADES.pdf
Jan. 04, 2023
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-446559947-444
Electronic Links
PCR Anexo 5 Acta de Inicio de Obra.pdf
Jan. 04, 2023
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-446559947-445
Electronic Links
PCR Anexo 6 Impacto sobre la valorizacion inmobiliaria en Quitumbe.pdf
Jan. 04, 2023
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-446559947-440
Electronic Links
PCR Anexo 1 - Reestructuracion del Estado 2017.pdf
Jan. 04, 2023
Spanish
Implementation Phase
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-35501
Project Monitoring Report ( Public version)
EC-L1129 First period Jan-Jun 2021 - Public Report.pdf
Mar. 01, 2022
English
https://www.iadb.org/document.cfm?id=EZSHARE-1631302019-143
Annual Project Audited Financial Statement
2021 EFAS 3341 OC-EC EF.pdf
Dec. 01, 2021
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-34857
Project Monitoring Report ( Public version)
EC-L1129 Second period Jan-Dec 2020 - Public Report.pdf
Jul. 20, 2021
English
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-34172
Project Monitoring Report ( Public version)
EC-L1129 First period Jan-Jun 2020 - Public Report.pdf
Mar. 09, 2021
English
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-26783
Notice of Contract Award (SG)
EC-L1129_C650901_AW.pdf
Jan. 27, 2021
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-26778
Notice of Contract Award (SG)
EC-L1129_C650019_AW.pdf
Jan. 27, 2021
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-33543
Project Monitoring Report ( Public version)
EC-L1129 Second period Jan-Dec 2019-Public Report.pdf
Aug. 24, 2020
English
https://www.iadb.org/document.cfm?id=EZSHARE-1631302019-56
Annual Project Audited Financial Statement
Préstamo 3341OC-EC - Estados financieros auditados 2019.pdf
Nov. 25, 2020
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-446559947-5
Project Monitoring Report ( Public version)
EC-L1129 First period Jan-Jun 2016-Public Report [40801345].PDF
Dec. 28, 2016
English
https://www.iadb.org/document.cfm?id=EZSHARE-446559947-4
Project Monitoring Report ( Public version)
EC-L1129 Second period Jan-Dec 2015-Public Report [40359732].PDF
Jun. 23, 2016
English
https://www.iadb.org/document.cfm?id=EZSHARE-446559947-3
Project Monitoring Report ( Public version)
EC-L1129 First period Jan-Jun 2015-Public Report [40211853].PDF
Mar. 29, 2016
English
https://www.iadb.org/document.cfm?id=EZSHARE-446559947-2
Project Monitoring Report ( Public version)
EC-L1129 Second period Jan-Dec 2014-Public Report [40209336].PDF
Mar. 28, 2016
English
https://www.iadb.org/document.cfm?id=EZSHARE-1019495965-26
Specific Procurement Notices
EC-L1129 [40098335].PDF
Feb. 01, 2016
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1019495965-22
Specific Procurement Notices
EC-L1129 [39537878].PDF
Mar. 30, 2015
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-2056220512-563
Loan Contract
Contrato - Fortalecimiento de la Gestión Intersectorial Social [39400183].PDF
Feb. 12, 2015
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-820377557-3
Loan Proposal
Fortalecimiento de la Gestión Intersectorial Social [39204575].PDF
Nov. 05, 2014
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1019495965-21
Loan Proposal
Intersectoral Social Management Strengthening [39204577].PDF
Nov. 05, 2014
English
https://www.iadb.org/document.cfm?id=EZSHARE-1019495965-20
General Procurement Notices
EC-L1129 [39180196].PDF
Oct. 24, 2014
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1019495965-19
Loan Proposal
Enlace - Filtros ESG [39175524].PDF
Nov. 05, 2014
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1019495965-18
Loan Proposal
Enlace opcional 4 - Análisis Económico [39061731].PDF
Nov. 05, 2014
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1019495965-15
Loan Proposal
Enlace opcional 1 - Mapa de Ministerios Coordinados del Sector Social [39047938].PDF
Nov. 05, 2014
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1019495965-16
Loan Proposal
Enlace opcional 2 - Nuevas Centralidades de Quito [39047959].docx
Nov. 05, 2014
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1019495965-17
Loan Proposal
Enlace opcional 3 - Planos de Plataforma Social [39047972].PDF
Nov. 05, 2014
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1019495965-14
Loan Proposal
Enlace Req__2 - Plan de Seguimiento y evaluación [39043927].docx
Nov. 05, 2014
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1019495965-11
Loan Proposal
Enlace Req__3 - Plan de Adquisiciones [39038985].xlsx
Nov. 05, 2014
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1019495965-12
Loan Proposal
Enlace Req__1 - PEP [39038997].PDF
Nov. 05, 2014
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1019495965-13
Loan Proposal
Enlace Req__4 - IGAS [39039530].docx
Nov. 05, 2014
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-24875
Specific Procurement Notices
EC-L1129_7620_SP.pdf
Jan. 30, 2020
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-1949
Project Monitoring Report ( Public version)
EC-L1129 Second period Jan-Dec 2017-Public Report.pdf
Aug. 02, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-24901
Specific Procurement Notices
EC-L1129_7623_3_SP_M.pdf
Feb. 04, 2020
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-31569
Project Monitoring Report ( Public version)
EC-L1129 First period Jan-Jun 2018-Public Report.pdf
Dec. 14, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-25125
Specific Procurement Notices
EC-L1129_8005_SP.pdf
Feb. 18, 2020
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-32268
Project Monitoring Report ( Public version)
EC-L1129 Second period Jan-Dec 2018-Public Report.pdf
Oct. 15, 2019
English
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-25265
Specific Procurement Notices
EC-L1129_0062_2_SP.pdf
Mar. 19, 2020
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-32903
Project Monitoring Report ( Public version)
EC-L1129 First period Jan-Jun 2019-Public Report.pdf
Feb. 12, 2020
English
https://www.iadb.org/document.cfm?id=EZSHARE-1132444900-21754
Specific Procurement Notices
EC-L1129 1519.pdf
Jan. 04, 2019
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1132444900-24047
Specific Procurement Notices
EC-L1129 1376.pdf
Oct. 24, 2019
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1132444900-24189
Specific Procurement Notices
EC-L1129 1406.pdf
Nov. 04, 2019
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1132444900-24580
Specific Procurement Notices
EC-L1129 1546.pdf
Dec. 03, 2019
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1132444900-24746
Specific Procurement Notices
EC-L1129 3341.pdf
Dec. 27, 2019
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-359
Project Monitoring Report ( Public version)
EC-L1129 Second period Jan-Dec 2016-Public Report.pdf
Feb. 14, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-1132444900-24747
Specific Procurement Notices
EC-L1129 3341 1.pdf
Dec. 27, 2019
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1631302019-3
Annual Project Audited Financial Statement
EFA 2016 3341-OC-EC Programa de Fortalecimiento de la Coordinación Intersectorial Social.pdf
Jul. 10, 2017
English
https://www.iadb.org/document.cfm?id=EZSHARE-1189094987-224
Annual Project Audited Financial Statement
Estado de inversiones acumuladas y estado de flujos de efectivo.pdf
Dec. 20, 2018
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-1398
Project Monitoring Report ( Public version)
EC-L1129 First period Jan-Jun 2017-Public Report.pdf
Feb. 15, 2018
English
Preparation Phase
https://www.iadb.org/document.cfm?id=EZSHARE-820377557-2
Project Profile
Programa de Fortalecimiento de la Gestión Intersectorial de Desarrollo Social - Perfil de Proyecto aprobado [38947328].PDF
Jul. 28, 2014
Spanish

Have an Environmental or Social issue related to IDB projects? File a Complaint

Jump back to top